The days it takes to copy everything off your old array are on no screen

About 15 minutes, from records you already have

The date your old array's support ends is on a contract. The days it takes to copy everything off it are not written anywhere, and you can work them out from two figures and one division.

Yes 2
Written down, with a date (a log, a screen, a document), and it meets your own plan.
Partly 1
Remembered, but not written down, or the record shows you missed your plan.
No 0
Nobody knows, or it was never done. A blank is a finding.

"None, checked on a date" counts as a record. No plan or target written down? Write your guess first, then measure: the guess is your plan.

Tap No, Partly or Yes for each question. Your score adds up as you go. Nothing you tap is saved or sent.

Five questions about your own setup

  1. 1 Days to copy off

    Your answer, and where it is written down (with the date) How many days would copying everything off the old array take? Write used space (TB) ___ divided by copy speed (TB per hour) ___ = hours ___, divided by 24 = days ___.

    Your answer
    Score 0, 1 or 2This quarterNext quarter

    How to raise it

    Where to find it:
    Rows 2 and 3 give the two figures. Divide used space by copy speed to get hours, then divide the hours by 24. Write the days next to the date in row 4.
    To get it to a 2:
    The days are written down from rows 2 and 3, dated, and sit next to the support end date.
    What this does not prove:
    The answer counts copying alone, at full speed. It is the least the move will take, not the length of the project.
  2. 2 Used space on the old array

    Your answer, and where it is written down (with the date) How much data does the old array hold today? Write the terabytes (TB) used, not the total size, and the date you read it.

    Your answer
    Score 0, 1 or 2This quarterNext quarter

    How to raise it

    Where to find it:
    The capacity screen on the old array. It usually shows used space per pool (a group of disks managed together). Add the pools up.
    To get it to a 2:
    A dated reading of used space, added up across every pool.
    What this does not prove:
    Used space grows. A reading from last year does not show what the array holds today.
  3. 3 A copy speed you have timed

    Your answer, and where it is written down (with the date) How fast did the last large copy you ran go? Write the terabytes moved divided by the hours it took, in TB per hour.

    Your answer
    Score 0, 1 or 2This quarterNext quarter

    How to raise it

    Where to find it:
    The job log of one large copy you already run, such as a volume move or a restore. It shows how much moved and how long it took. Do not use a number from a spec sheet.
    To get it to a 2:
    A dated job log entry for a large copy, with the speed worked out from it.
    What this does not prove:
    The speed you timed is not the speed of the real move. The new array, the network and whatever else is running change it.
  4. 4 The support end date

    Your answer, and where it is written down (with the date) On what date does the maker stop supporting the old array? Write it here, and the days from row 1 beside it.

    Your answer
    Score 0, 1 or 2This quarterNext quarter

    How to raise it

    Where to find it:
    Your support contract, or the maker's own page for that model, or your partner. Write where you found it.
    To get it to a 2:
    A date taken from the contract or the maker's page, written next to the days of copying.
  5. 5 The day the move must start

    Your answer, and where it is written down (with the date) Is a start date for the move on the calendar, at least the days in row 1 before the support end date, and who owns it?

    Your answer
    Score 0, 1 or 2This quarterNext quarter

    How to raise it

    Where to find it:
    Your team calendar or change schedule. Count back from the support end date by the days in row 1, and more for everything the division leaves out.
    To get it to a 2:
    A start date on the calendar at least the days in row 1 before support ends, with a named person. A date that leaves fewer days than row 1 scores 1.

Your total, out of 10

9-10 Known
Score the same page again next quarter.
5-8 Partly known
Fix your lowest row this week.
0-4 Assumed
Do row 1 this week.

Two rules beat the total: if row 1 scores below 2, the result is Assumed. Any row that missed your plan or guess is your next step.

Which of your old arrays would take longest to copy off, and have you timed a copy?

What this does not prove

The days you work out are the least the move will take. They count copying alone, at full speed, and show nothing about the planning, testing and cutover around it.

Made by StepKnock, a small team in San Diego, paid through our partners when a customer buys. This page sells nothing.

Take it with you

Download PDFPDF, 762 KBSHA-256 f5bcadb2f551d9

Or print this page (Print, then Save as PDF) to keep what you tapped.

Nothing to sign up for. No cookies, no analytics, and nothing you type here leaves this page.

stepknock.com/toolkit/checks/days-to-copy-off/